Skip to content

Services

Everything you need to grow.

Five services, each with its own page: what’s included, honest answers, and proof where it exists.

Where to start

Five directions, one team.

Each one below starts from the situation you are in rather than the thing we sell. If two fit, the first is usually the right one — the rest tend to follow from it.

Timelines

How long things actually take.

Websites deploy in about 14 days from payment. Apps, agents, and database work are scoped per project — your quote states the timeline.

Payment is the start line because it is the one date we both control. Scope, content, and third-party access move the finish, and your quote says which of those it is waiting on. If a project needs longer than 14 days, we will say so before you sign rather than after.

Complex custom applications typically run 4–6 weeks. Nothing about that is a problem — a fourteen-day quote on a six-week project is.

Ask what yours would take

The stack

What we build with.

We name the tools because you will maintain this after we leave, and a stack you were never shown is a stack you cannot judge. Each case study links to the live site — you can inspect what shipped.

Web and apps

  • React and Next.js for anything with an interface
  • Shopify for commerce, on themes or headless
  • SvelteKit where a fast content site matters more than the ecosystem
  • TypeScript and Tailwind throughout

Testing

  • Playwright for web flows
  • Appium for mobile
  • Selenium where an existing suite already runs on it
  • Coverage starts with the paths that move money — checkout, signup, billing

Data

  • SQL and document stores, chosen per workload
  • Reversible migrations with backfill and verification

Already have a stack? We adapt to yours rather than replacing it — if it runs automated checks in CI, we can work with that.